PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Enclosed Column G-6.5.jpg Laying out block at the 1st floor Sprinkler Room Facing West.jpg Enclosing columns at the 3rd floor Facing East.jpg Installed alternating stair tread to the Lower Roof Facing East.jpg Installed window frame at the 3rd floor Attorneys Room Facing West.jpg Installing ductwork raisers at the 3rd floor Facing West.jpg Installing weather strips along the curtain wall South Elevation.jpg
Previous pageNext page Installed window frame at the 3rd floor Attorneys Room Facing West
Installed window frame at the 3rd floor Attorneys Room Facing West